Cascadia Elementary & Robert Eagle Staff Middle School
cascadia Elementary & Robert Eagle Staff Middle School-Seattle, WA
Description.
cascadia Elementary & Robert Eagle Staff Middle School-Seattle, WA
Hazeldale Elementary School- Beaverton, OR Hazeldale Elementary is School number 3 of the cookie cutter schools we have helped to build for the Beaverton School District. Although the design for this school was very complex, we went into this build with a well developed knowledge of how this project would fit together. we had the …
Sato Elementary School- Beaverton, OR This is the first in a sequence of carbon copy Elementary Schools in which PPE plays a critical role. Sato Elementary School is an excellent example of how, by leading from the middle, we can create a win-win Solution. Not only for all of the trades that we have to …
Vose Elementary School- Beaverton, OR Vose Elementary School was the second in a succession of Identical Elementary Schools, in which PPE played a critical role in building. For this particular project, we were responsible for the structural steel as well as the precast. In a job of this size and complexity it has definitely benefited …
The Davenport Grand- Spokane, WA This 15-story, 700-room luxury hotel development in downtown Spokane showed that our expertise goes beyond precast installation — we utilized a systematic approach that benefitted the entire project. In this instance, the owner wanted all pieces manufactured by a certain deadline, but didn’t realize that his aggressive schedule would actually delay …
FBI Building- Portland, OR Instead of working continuously on this 10-story apartment building, as we would with most projects, we completed two floors at a time. This meant we had to mobilize in and out of the site more than 10 times over the course of our 350-piece installation, but that flexibility allowed the contractor …
FBI Building- Portland, OR We managed several unique challenges on this project, including the strict personnel and national-security requirements that one would expect while working for the FBI. We couldn’t even take cell phones on site without a special pass. This building was one of our largest sealant jobs to date, and the use of colored …
Lamb Weston Facility- Boardman, OR We installed 2,700 precast pieces for this 192,000-square-foot, $220 million addition to Lamb Weston’s Boardman facility, allowing the company to expand its processing capabilities for frozen potatoes and other vegetables. This was a complex project requiring a great deal of technical knowledge — we had to create the superstructure before …
Zodiac Areospace Building Repair A major repair job. Zodiac consisted of the removal and replacement of damaged and degraded precast doubletee roof and walls. Our team Worked closely with the crane company, the general contractor and the building owner. We devised a plan to safely pull out and replace the damaged tees without causing additional damage to the structure or their machinery.
CPM East Valley Mine Bridge This small bridge is the connection to the new access road for the mine. It consisted of 10 Abutment walls and 12 pieces of hollowcore plank for the deck. Vern Trantum worked just over a day to complete the installation of the bridge.